02-28-2014, 11:59 AM
The selection order matters. If you have two splines A and B you want to connect to C:
- Select an end CP of A and the target CP of C afterwards (hold CTRL to select both CPs), then click on "Connect"
- Select an end CP of B and the tgarget CP of C (can be the same as above), then click on "Connect"