Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Sync orientation at connection points (Dynamic))
#1
As the tiles says, I want to sync orientation at connection points when spline orientation is set to Dynamic.

https://gyazo.com/c3ae8471b6419aa8403b67438cc5bc1d
Reply
#2
I think setting that CP as an orientation anchor would fix the issue. If not, please send me a reproduction case
Please consider leaving a review for Curvy. This will help a lot keeping Curvy relevant in the eyes of the Asset Store algorithm.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  To dynamic generate the connection between paths Canis 4 308 08-07-2020, 07:33 PM
Last Post: _Aka_
  Max distance between points HTRCH 1 224 07-11-2020, 01:07 PM
Last Post: _Aka_
  How do join 3 splines && Orientation problem athos_k 3 455 07-09-2020, 10:41 AM
Last Post: _Aka_
  Control points parenting briceio 2 368 06-18-2020, 04:12 AM
Last Post: briceio

Forum Jump: