Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Connection tags
#4
The order in which you select the CP's shouldn't matter. If you can connect them (i.e. the toolbar option is available), everything should go well, at least it does when I build the scenario your screenshot shows. I'll post my project tomorrow (it's on my dev machine).

There's no ETA for the new system yet. It needs a lot of polishing, but in the long run it will succeed the current system in every way. Basically it organizes a network map on top of the splines, you define the flow between paths, give paths a cost (for pathfinding) and so on...
Reply


Messages In This Thread
Connection tags - by Bryan Thatcher - 07-09-2014, 12:56 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
Bug Changing spline connection in inspector causes splines to revert to defaults lacota 3 6 03-18-2024, 07:55 PM
Last Post: _Aka_
Thumbs Up Can't delete connection lacota 3 6 03-16-2024, 11:34 AM
Last Post: _Aka_
Lightbulb Junction & Connection Navigation System Design SAMYTHEBIGJUICY 4 13 11-27-2023, 01:04 PM
Last Post: _Aka_
  Connection "next' control point jh092 3 15 11-22-2023, 11:47 AM
Last Post: _Aka_

Forum Jump: