07-09-2014, 02:23 PM
Hi Bryan,
I agree that the tag-based connection system is complicated, that's why a new system is in the pipeline.
To make your example work, use the following settings:
First: Set Tag for the two connections belonging to the first spline to "First"
Second: Set Tag for the two connections beloning to the second spline to "Second"
ConnectionWalker: set MinTagMatches to 1 (default) and leave Additional Tags empty. Then, to use the first or second spline, set Additional Tags to "First" or "Second".
Best regards,
Jake
I agree that the tag-based connection system is complicated, that's why a new system is in the pipeline.
To make your example work, use the following settings:
First: Set Tag for the two connections belonging to the first spline to "First"
Second: Set Tag for the two connections beloning to the second spline to "Second"
ConnectionWalker: set MinTagMatches to 1 (default) and leave Additional Tags empty. Then, to use the first or second spline, set Additional Tags to "First" or "Second".
Best regards,
Jake