Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
SplineController Ignores Follow-Up and Chooses Wrong Spline
#5
Sorry, maybe I didn't explain it well — or perhaps I'm still not fully understanding how it works.
At "connection 5", I need both objects coming from road_spline_01.CP0014 and from road_spline_connection_3.CP0001 to continue to road_spline_01.CP0015. That's why both control points are set with a "Follow-Up" to road_spline_01.CP0014.
The SplineController is configured as "Follow-Up Otherwise Random", since in other connections there are valid branching options. However, sometimes objects coming from road_spline_01.CP0014 go to road_spline_connection_3.CP0000, which I don't want. I’d like to force the flow to always continue to
road_spline_01.CP0015 after road_spline_01.CP0014, with no possibility of switching splines at that point.

I've attached some screenshots — could you please take a look and let me know if I'm configuring something incorrectly?

Thanks a lot for your help and patience!


Attached Files Thumbnail(s)
               
Reply


Messages In This Thread
RE: SplineController Ignores Follow-Up and Chooses Wrong Spline - by Josenildo - 07-25-2025, 05:56 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
  Spline Spots from 2 samples. BitBlit 8 914 06-30-2026, 11:49 AM
Last Post: _Aka_
  Best way to duplicate a spline with an offset Kapistijn 8 2,297 04-12-2026, 03:18 PM
Last Post: _Aka_
  Play() does not cause SplineController to produce expected behaviour ConCat 8 2,249 02-08-2026, 11:54 AM
Last Post: _Aka_
Smile Constant speed along a spline? tfishell 1 938 11-13-2025, 11:32 AM
Last Post: _Aka_

Forum Jump: