Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Connections and control point synchronization by script
#3
Once you've established a connection, a change to a participating CP will refresh the connection. I.e. change the position of an involved CP and the connection will force all it's CP's to sync position (if they have the corresponding flag set).
Reply


Messages In This Thread
RE: Connections and control point synchronization by script - by Jake - 01-22-2016, 01:03 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
  Control Point Interpolation Overrides. rickgplus 1 878 12-11-2025, 08:52 AM
Last Post: _Aka_
  Connections Between Opposing Splines lockiidraws 1 925 12-04-2025, 02:14 PM
Last Post: _Aka_
  12_Train junction point richardzzzarnold 5 4,037 04-16-2025, 02:19 PM
Last Post: _Aka_
  OnAfterControlPointAdded - Control Point is null jh092 5 3,787 02-04-2025, 09:31 PM
Last Post: _Aka_

Forum Jump: